ПРОЕКТИРОВАНИЕ МАЙНСКОЙ ГЭС-2. АНАЛИЗ ИМЕЮЩИХСЯ ДАННЫХ : доклад, тезисы доклада

Описание

Тип публикации: доклад, тезисы доклада, статья из сборника материалов конференций

Конференция: Гидроэлектростанции в XXI веке; Саяногорск; Черемушки; Саяногорск; Черемушки

Год издания: 2022

Ключевые слова: Mainskaya HPP, hydraulic unit, idle discharges, design, modernization, reconstruction, energy losses, efficiency, counter-regulator, проектирование ГЭС

Аннотация: The Mainsky hydroelectric complex was built as a counter-regulator of the Sayano-Shushenskaya hydroelectric power station. The Mainsky hydroelectric complex is designed to smooth out constant fluctuations in the flow rates and water levels of the Sayano-Shushenskaya HPP. At the moment, the hydroelectric units of the Mainskaya HPP hПоказать полностьюave reached the standard service life and have reached a high degree of wear. As part of the Comprehensive Modernization Program for Hydroelectric Power Plants, RusHydro decided to replace hydroelectric units. The modernization of all three hydroelectric units will eliminate the existing restrictions on power output. The article presents the energy parameters of the Mainskaya HPP. The analysis of these parameters was carried out. Electricity losses were calculated for the last 3 years.

Ссылки на полный текст

Издание

Журнал: Гидроэлектростанции в XXI веке

Номера страниц: 99-103

Издатель: Саяно-Шушенский филиал Федерального государственного автономного образовательного учреждения высшего профессионального образования «Сибирский федеральный университет»

Персоны

  • Балябина Д.В. (Сибирский федеральный университет)

Вхождение в базы данных