Well completion technology evaluation for oil rim field development using permanent tracers: A case study from north-komsomolskoye field : материалы временных коллективов

Описание

Тип публикации: доклад, тезисы доклада, статья из сборника материалов конференций

Конференция: SPE Russian Petroleum Technology Conference 2017

Год издания: 2017

Аннотация: Excessive sand production, uneven recovery of reserves throughout the length of a horizontal well and early water and gas breakthrough are deemed to be the main problems while developing poorly consolidated terrigenous fields with contact reserves. Assessment of feseability of possible completion systems (gravel packing and autonomПоказать полностьюous inflow control devices were chosen for implementation) is necessary at the pilot stage of the project. Pilot wells shall be monitored at each stage including development, recovery, observation over the dynamics of water and gas breakthrough processes. The use of traditional PLT methods is not always technologically feasible and cost-effective. This article describes the experience of using stationary of intelligent inflow markers for permanent monitoring for the purposes mentioned above. Copyright 2017, Society of Petroleum Engineers.

Ссылки на полный текст

Издание

Журнал: Society of Petroleum Engineers - SPE Russian Petroleum Technology Conference 2017

Издатель: Society of Petroleum Engineers

Персоны

  • Gashimov R.R. (RN-Purneftegaz LLC, Russian Federation)
  • Salyaev V.V. (NK Rosneft PJSC, Russian Federation)
  • Nuykin A.M. (NK Rosneft PJSC, Russian Federation)
  • Arzamastsev G.G. (NK Rosneft PJSC, Russian Federation)
  • Safin A.F. (Gazprom Neft PJSC, Russian Federation)
  • Mukhametshin I.R. (Resman Rus LLC, Russian Federation)
  • Nukhaev M.T. (Siberian Federal University, Resman Rus LLC, Russian Federation)
  • Prusakov A.V. (RESMAN AS, Russian Federation)

Вхождение в базы данных