Тип публикации: доклад, тезисы доклада, статья из сборника материалов конференций
Конференция: Aspire to Science; Новосибирск; Новосибирск
Год издания: 2019
Ключевые слова: hydroenergy, capacity, hydroelectric power plant (HPP), supervisory control, low-water period, probability curve, upstream, downstream, normal water level (NWL), dead storage level (DSL)
Аннотация: The object of the research is Votkinsk HPP with an installed capacity of 1020 MW. The guaranteed capacity of the estimated dry year was obtained because of this research. The results are important in the regulation of operation modes of reser-voir, because they are the beginning for the supervisory control of HPP.
Журнал: Aspire to Science
Номера страниц: 158-162
Издатель: Новосибирский государственный технический университет